Week 1
UTMB Training Plan
This 24-week UTMB plan builds from 41 mi to 65.5 mi a week, with a longest run of 26 mi 3 weeks before race day and a 3-week taper. Easy runs are at 10:56–12:00/mi and threshold work at 9:13/mi. Built for this course, it adds downhill quad conditioning, long runs that rehearse the hardest miles, heat acclimation, altitude, weekly vertical and back-to-back long runs.
- Weeks
- 24
- Peak week
- 65.5 mi
- Longest run
- 26 mi
- Easy time
- 95%
Built for the UTMB
What the course’s real elevation profile, fatigue model and race-day weather history add to a standard plan, and why.
Downhill quad conditioning
Why: You run 3,360 ft of downhill before the miles 23–28 climbs. Our fatigue model puts quad damage at 99% of its ceiling by then, so those climbs cost 2.7× what they would on fresh legs.
In the plan: Controlled downhill repeats on a 6% descent every other week in the build and peak phases, stopping before the taper. A first bout of downhill running reduces the damage from the next one (the repeated-bout effect).
Long runs that rehearse the hardest miles
Why: The hardest climbing is miles 23–28: 4,137 ft of gain, mile grades +15.0%, +7.6%, +16.3%, +14.0%, +17.5%, +7.9%.
In the plan: Peak-phase long runs put hills with those grades at the same point in the run.
Heat acclimation
Why: In 5 of the last 10 years, race-morning heat and humidity were enough to slow race pace by at least 1%. Median conditions: 63°F, dew point 51°F.
In the plan: Easy runs in the final two to three weeks are flagged for heat exposure: run them in the warmest part of the day or with an extra layer, keeping the effort easy. Repeated heat exposure over one to two weeks produces most acclimatization.
Altitude
Why: The course averages 5,384 ft above sea level. Our altitude model costs that 0.3% at race pace.
In the plan: Run by effort, not pace, at elevation, and plan to arrive either well ahead of race day or as close to the start as you can.
Weekly vertical
Why: The UTMB climbs 31,991 ft (296 ft per mile).
In the plan: Each week has a climbing target scaled to that ratio, rising to race density in the peak phase. Power-hike the steep climbs in long runs, as you will on race day.
Back-to-back long runs
Why: At 108 miles, race day is far longer than any single training run should be.
In the plan: Build and peak weeks pair the long run with a medium-long run the day before, so you practice running on tired legs without one huge run.
Weekly volume builds from 41 mi to 65.5 mi in week 14
24 weeks, 3 of them taper. Volume rises no more than 10% a week, with 5 cutback weeks to absorb the work. Race week excludes the race itself.
Training distance per week from this plan (race excluded), from the Runner's Math plan generator.
View the data
| Week | Dates | Phase | Volume (mi) | Long run (mi) |
|---|---|---|---|---|
| 1 | Mar 11–Mar 17 | Base | 41 | 16 |
| 2 | Mar 18–Mar 24 | Base | 45 | 17.5 |
| 3 | Mar 25–Mar 31 | Base | 49.5 | 19.5 |
| 4 | Apr 1–Apr 7 | Base (cutback) | 38 | 15.5 |
| 5 | Apr 8–Apr 14 | Base | 52.5 | 21.5 |
| 6 | Apr 15–Apr 21 | Base | 57.5 | 23.5 |
| 7 | Apr 22–Apr 28 | Base | 63 | 26 |
| 8 | Apr 29–May 5 | Build (cutback) | 51.5 | 20.5 |
| 9 | May 6–May 12 | Build | 65 | 26 |
| 10 | May 13–May 19 | Build | 65 | 26 |
| 11 | May 20–May 26 | Build | 65 | 26 |
| 12 | May 27–Jun 2 | Build (cutback) | 52.5 | 21 |
| 13 | Jun 3–Jun 9 | Build | 65 | 26 |
| 14 | Jun 10–Jun 16 | Build | 65.5 | 26 |
| 15 | Jun 17–Jun 23 | Build | 65 | 26 |
| 16 | Jun 24–Jun 30 | Peak (cutback) | 52.5 | 21 |
| 17 | Jul 1–Jul 7 | Peak | 65.5 | 26 |
| 18 | Jul 8–Jul 14 | Peak | 65.5 | 26 |
| 19 | Jul 15–Jul 21 | Peak | 65.5 | 26 |
| 20 | Jul 22–Jul 28 | Peak (cutback) | 52.5 | 21 |
| 21 | Jul 29–Aug 4 | Peak | 65 | 26 |
| 22 | Aug 5–Aug 11 | Taper | 52 | 18 |
| 23 | Aug 12–Aug 18 | Taper | 43 | 13 |
| 24 | Aug 19–Aug 25 | Taper | 29.5 | 0 |
95% of your running time is easy
About 80% easy is what well-trained endurance athletes do (Seiler, 2010). The hard work is small in time but does the most specific damage, so it gets the recovery around it.
Estimated minutes per zone from each workout's distance and your VDOT paces. Moderate = marathon pace and controlled downhills; hard = threshold and faster, hills and strides. Race day excluded.
View the data
| Week | Easy | Moderate | Hard | Total time |
|---|---|---|---|---|
| 1 | 100% | 0% | 0% | 7:52 |
| 2 | 100% | 0% | 0% | 8:38 |
| 3 | 100% | 0% | 0% | 9:30 |
| 4 | 96% | 0% | 4% | 7:14 |
| 5 | 95% | 0% | 5% | 9:53 |
| 6 | 97% | 0% | 3% | 10:57 |
| 7 | 95% | 0% | 5% | 11:53 |
| 8 | 98% | 0% | 2% | 9:47 |
| 9 | 96% | 0% | 4% | 12:17 |
| 10 | 96% | 2% | 3% | 12:24 |
| 11 | 96% | 0% | 4% | 12:21 |
| 12 | 97% | 0% | 3% | 9:59 |
| 13 | 94% | 0% | 6% | 12:12 |
| 14 | 95% | 2% | 3% | 12:30 |
| 15 | 93% | 0% | 7% | 12:10 |
| 16 | 97% | 0% | 3% | 9:59 |
| 17 | 93% | 0% | 7% | 12:14 |
| 18 | 91% | 2% | 6% | 12:22 |
| 19 | 92% | 0% | 8% | 12:13 |
| 20 | 97% | 0% | 3% | 9:59 |
| 21 | 90% | 0% | 10% | 11:58 |
| 22 | 94% | 0% | 6% | 9:43 |
| 23 | 94% | 0% | 6% | 8:03 |
| 24 | 94% | 6% | 0% | 5:36 |
| Plan | 95% | 0% | 4% | 251:45 |
Your training paces · VDOT 35
From Jack Daniels’ VDOT tables (Daniels–Gilbert equations), using your recent race. Recalculate after a new race or every 4–6 weeks.